Miramar College Project Sites
 

 1354 - Parking Structure #1 & Police Substation


Project Delivery Method:
Project Budget:

Construction Duration:

Design-Build
$17.9 million
2010-2011

 
Scope/Summary

The Miramar College Police Station will include a spacious reception area, a conference room, office areas, and a secure suspect processing area.  These spaces are organized along the building’s perimeter to provide for a welcoming and well-lit area maximizing natural daylight.  The station will be attached to the campus side (west side) of the parking structure, creating a strong integration of the new structure into the existing campus.  The tower element will provide strong visibility from the campus as well as the transit center, and enhance the sense of public safety on campus.  A terra cotta façade will tie the new facility into the look and feel of existing buildings on campus.  The three-story parking structure will provide 815 parking spaces.

The project is designed to obtain a Leadership in Energy and Environmental Design (LEED) Platinum certification – the highest possible certification and the first Platinum project for a community college locally.  It includes a number of unique sustainable features:

  • The project includes a green roof and green screen with vegetation that helps insulate the building from intense temperatures and heat gain.  They also absorb storm water, reducing the need for complex and expensive draining systems, and minimizing our impact on the local storm drain system. 
  • The tower element serves as a solar chimney to create a natural flow of ventilation in the building.  Louvers in the tower’s upper level will allow warm air to rise by convection and escape to the outside. At the same time, cooler air can be drawn in through vents at the lower level, driving the air flow even long after the sun has gone down.
  • Significant energy savings will be achieved with daylight harvesting.  Main spaces are grouped along the perimeter with large windows and light shelves.  Internal areas will be day-lit through solar tubes that bring light down from the roof.

By The Numbers:

  • Four level parking structure has 815 new parking spots
  • 270,000 gross square feet of floor area in the parking structure; 5,108 square feet in the police station
  • 8,470 yards of concrete
  • 800 total concrete truck deliveries
  • 11,160 linear feet of steel beams
  • 15,948 linear feet of paint striping in parking structure
  • 12 solar tube diffusers
  • 2,360 square feet of green roof on the police station which consists of 10 different varieties of plants
  • Architect: Harley Ellis Devereaux for Police Substation. International Parking Design (IPD) for Parking Structure.
  • General Contractor: McCarthy Building Companies
  • Structural Engineer: Jessen-Wright Structural Engineers
  • Electrical Engineer: Randall Lamb
  • Civil Engineer: Burkett & Wong Engineers
  • Mechanical/Plumbing Engineer: Shadpour Consulting Engineers Inc.
  • Landscape Architect: Schmidt Design Group Inc.
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: James Bray, Gafcon, Inc.
  • Project Manager: Charlotte Zolezzi, Gafcon, Inc.
  • Furniture, Fixture and Equipment (FF&E) Project Manager: Tricia Hendrickson, Gafcon, Inc.

 1354 - Parking Structure #1 & Police Substation: News & Events

1/1/2012The Greening of San Diego Miramar College
12/19/2011College Opens Police Station, Parking Structure on Campus - San Diego Business Journal
12/6/2011'San Diego Miramar College Police Station to Seek LEED Platinum' - Association for the Advancement of Sustainability in Higher Education
12/6/2011'McCarthy Completes Construction of Miramar College Parking Lot, Police Station' - World Interior Design Network
12/5/2011'McCarthy Completes Miramar College Parking Structure and LEED Platinum-Designed Police Substation' - Parking Network
12/1/2011'Miramar College Completes Environmentally Friendly Police Substation/Parking Garage' - San Diego Reader
11/30/2011'Glass Products Contribute to Sustainable Features in New Police Substation ' - Architects' Guide to Glass and Metal
11/30/2011'McCarthy Completes Miramar College Police Station' - Newswire Today
11/30/2011McCarthy Completes Miramar College Parking Structure and LEED Platinum-Designed Police Substation - McCarthy.com
11/29/2011'McCarthy Completes Construction of Miramar College Parking Structure and LEED Platinum-Designed Police Substation' - Done Deals
11/29/2011'Construction completed on LEED Platinum campus police substation' - The Daily Transcript
11/23/2011Daily Business Report 'Opening Set for Miramar College Police Station' - San Diego Metropolitan
11/22/2011MEDIA ADVISORY: San Diego Miramar College Celebrates Opening of Green Police Station
11/1/2011San Diego Miramar College eNews November 2011
10/28/2011Miramar College Parking Structure and Police Substation Grand Opening Invitation
4/27/2011Miramar College Police Station Topping Off Video
10/1/2010Constructor: The Magazine of the Associated General Contractors of America member news
9/27/2010"Concrete pour begins on Miramar projects" - The Daily Transcript
8/26/2010'Proposition S, N transforming community college campuses' - San Diego Daily Transcript, Kent Weil
7/29/2010'Colleges' upgrade begins' - The San Diego Union Tribune
7/26/2010'Miramar College breaks ground on LEED building - Construction Digest
7/14/2010Miramar College Police Station Ground Breaking Invitation for July 14th, 2010
7/14/2010'Miramar College Parking Structure and LEED Platinum-Designed Police Substation Breaks Ground' McCarthy News | McCarthy Building Companies, Inc.
7/6/2010Media Advisory: 'San Diego Miramar College breaks ground for new parking structure & police station'
7/9/2009'McCarthy set to build project at Miramar College' - The Daily Transcript
7/7/20092009.07.07 'McCarthy Gets $24.3 million Building Contract' - San Diego Metropolitan Magazine Daily Business Report