Miramar Infrastructure Phase I

Project Delivery Method:
Project Budget:
Construction Duration:
Funding Source:

Design-Bid-Build (Agency CM)
$9.7 million

2008 - 2010 

Proposition S

 
Scope/Summary

The Infrastructure Phase I project consists of renovated new surface parking lots, road improvements, utility support to future buildings, new sidewalks and landscaping over a majority of the campus.

 

By the numbers:
  • 18.3 Miles or 98,589 linear feet of irrigation pipe buried in the ground ranging in size from 6-inch diameter down to 3/4-inch diameter
  • 7,800 pop-up sprinkler heads
  • 21,457 square feet of drip irrigation in appropriate areas to minimize water use
  • 763 newly planted trees (24' box, 36' box and 60' box sizes)
  • 63,770 newly planted shrubs, ornamental grasses and ground covers
  • 149,561 square feet of newly created turf areas
  • 51,794 square feet of native plant buffer adjacent to the environmentally sensitive area on the northwest portion of the site
Project Team:
  • Architect: Wimmer Yamada & Caughey
  • Contractors: West Coast General Corporation
  • Mechanical Engineer: MA Engineering
  • Electrical Engineer: LSW Engineers California Inc. (Electrical Design)
  • Civil Engineer: R.B.F. Consulting
  • Landscape Architect: Wimmer Yamada and Caughey
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: James Bray, Gafcon, Inc.
  • Project Manager: Charlotte Zolezzi, Gafcon, Inc.

 13511 - Infrastructure - Phase I: News & Events