Miramar College Project Sites
 

 13110 - Library & Learning Resource Center


Project Delivery Method:
Project Budget:

Construction Duration:
Funding Source:

CM Multi-Prime
$37.4 million
December 2009 - May 2012
Proposition N

 
Scope/Summary

The Miramar College Library/Learning Resource Center (LLRC) will be a three-story, 105,000 gross square feet facility to provide state-of-the art teaching and independent learning spaces and will include a new library, classrooms, computer labs, tutoring services, a media production facility, and faculty and staff offices and work space. The LLRC is flanked by the Humanities & Arts and Business & Mathematics buildings, also funded as part of Propositions S and N.

The building is designed to obtain Leadership in Energy and Environmental Design (LEED) Silver certification by the United States Green Building council (USGBC). The LLRC will include a number of sustainable features:

  • Design Maximizes both daylight and views to the outside, increasing user comfort and productivity, and reducing the need for artificial light.
  • All windows use "high performance" glass that allows sunlight to filter into the building, but reduces the amount of UV light and solar heat entering the building
  • Extensive use of construction and design materials made with recycled content
  • Materials are locally produced or harvested, and will produce little or no chemical fumes
  • High efficiency plumbing and electrical fixtures
  • Light colored roofing, concrete paving and canopy-type trees reduce the heat absorbed and re-radiated from the building and site
  • A rooftop deck will provide gathering space and area for future solar photovoltaic panels
  • Trees and shrubs have been selected for their compatibility to the area, to provide shade and to minimize the need for water
  • A high efficiency irrigation system uses reclaimed water, and utilizes a controller that adjusts itself to local weather, resulting in significant water savings
  • Diversion of at least 75% of construction waste from local landfills
Project Team:
  • Architect: Zagrodnik + Thomas Architects
  • Construction Manager: Sundt
  • Mechanical/Plumbing Engineers: M.A. Engineering, Inc.
  • Electrical Engineer: Michael Wall Engineering
  • Civil Engineer: Burkett & Wong Engineers
  • Structural Engineer: Miyamoto International
  • Landscape Architect: Wimmer Yamada and Caughey
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: James Bray, Gafcon, Inc.
  • Furniture, Fixture & Equipment (FF&E) Project Manager: Laura Faustine, Gafcon, Inc.

 13110 - Library & Learning Resource Center: News & Events

9/17/2010"Miramar College celebrates “Topping off” of Library Learning Resource Center" San Diego County News
9/13/2010"Miramar College library tops out" - San Diego Union Tribune
9/10/2010Miramar College LLRC Topping Off Ceremony Invitation
9/1/2010Media Advisory - "Topping Off" of Library Learning Resource Center at San Diego Miramar College
8/13/2010Miramar College Library Learning Resource Center Fact Sheet (August, 2010)
11/18/2009'Library Construction Starts at Miramar College' - The San Diego Union Tribune
10/14/2009"San Diego Mesa College Allied Health Building" - allvoices.com