 1241 - Student Services Building


Project Delivery Method:
Project Budget:

Construction Duration:

CM Multi-Prime
$45.8 million
2010 - 2012

 
Scope/Summary

This new four story, 85,000 gross square feet building will include new facilities for student services on campus. Services include Admissions, Financial Aid, Evaluations and Testing, Counseling, Student government, Disable Student Services, Information and Outreach, classrooms, conference areas and a Terrace Café. The project also includes a new express elevator between the lower parking lot and the upper campus

All of the departments are arranged around an open four-level atrium, where students can interact with each other and the various departments in a single location. Each department opens into the atrium without doors, encouraging students and department faculty to engage each other without barriers.

Each floor opens up onto a series of outdoor terraces that move up the hillside slopes adjacent to the project, connecting the building to its location on campus and creating a vibrant point at the new north entryway to the campus.

The building is design to meet LEED Silver certification. Projected energy savings of 340,000 kWh annually are 35% better than state requirements. Water-efficient plumbing, irrigation and landscape will result in a water savings of 40% on the building use and 50% on landscape. The project will include materials and finishes that include recycled content, attention to indoor air quality and the use of natural daylight.

Construction is tentatively scheduled to start in Spring 2010. Target completion date is Fall 2011.

 
  • Architect: Hanna Gabriel Wells Architect
  • Construction Manager: PCL Construction
  • General Contractors: Multi-Prime
  • Civil Engineer: Snipes-Dye Engineering
  • Electrical Engineer: Michael Wall Engineers
  • Mechanical Engineer: McParlane and Associates
  • Landscape Architect: MLA Design Studio
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Diane K. Malone, AIA NCARB LEED AP, Gafcon, Inc.
  • Project Manager: Mike Clark, Gafcon, Inc.
  • Furniture, Fixture and Equipment (FF&E) Project Manager: Laura Faustine, Gafcon, Inc.
Lightbox Gallery

 1241 - Student Service Center: News & Events

7/13/2009Mesa College Student Services Design Presentation to COC
6/21/2010San Diego Business Journal: 'Groundbreaking: Student Services Center at San Diego Mesa College
9/14/2010"San Diego Mesa College breaks ground for new Student Services Center" - Media Advisory
9/15/2010"Mesa College Student Center Construction to Begin" - San Diego Metropolitan Magazine
9/17/2010"Groundbreaking set for new Mesa College building" - The Daily Transcript
9/22/2010Mesa College Student Service Center Ground Breaking Ceremony on Sept. 22th @ 10 am
9/22/2010"San Diego Mesa College breaks ground for new Student Service Center" - Media Advisory
9/22/2010'San Diego Mesa College Student Services Center Groundbreaking Ceremony' - youtube.com by Mike Gast (Video)
9/28/2010"Groundbreaking ceremony reveals new student services building" - The Mesa Press
10/4/2010"Construction Starts on Student Services Center" - Real Estate Roundup | San Diego Business Journal
4/6/2011'Student Services Building in Steel Stage' - SanDiegoMetro.com
4/25/2011'Topping Out Mesa College Student Services' - Media Advisory
4/29/2011Mesa College Student Services Topping Off Video
5/20/2011'Mesa College Student Services Center Top Out' - Daily Transcript
5/31/2011Mesa College Student Services - Structural Steel Video
6/23/2011'Construction Boom at Area Colleges, Universities' - Roger Showley
11/3/2011'Successful Projects Means Successful Students' - The Mesa Press