Skip to main content

San Diego Community College District

Propositions S & N
Projects
Program Status
Design/Construction
Propositions S&N
Projects
Programs
Contractors
Construction Bond Program

 Project Related Resources

 Gallery

 Campus Related Resources

Construction Bond Program > Projects: Front Page > City College > Pages > 1143II.aspx  

City College Project Sites
 

 11430 - Infrastructure Phase II


Sewer/Stormwater

Project Delivery Method:
Project Budget:
Construction Duration: Funding Source:

Design-Bid-Build
$7 million
2010-2011 Proposition N

  • Engineer: AB Engineering
  • Contractor: PK Mechanical
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Thomas J. Fine, CCM, JE Moore Consulting, Inc.
  • Construction Manager: Guy Meads, JE Moore Consulting, Inc.
Data/IT
Project Delivery Method:
Project Budget:
Construction Duration: Funding Source:

Design-Bid-Build
$2.2 million
2010 - 2011 Proposition N

This project provided an infrastructure “loop” around the entire campus that will allow for the installation of data cabling and fiber optic lines to support the existing campus as well as the new Proposition S & N projects being constructed on campus. This project was completed on time and within budget.
  • Engineer: Randall Lamb
  • Contractor: 3D Enterprises
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Thomas J. Fine, JE Moore Consulting
  • Construction Manager: Guy Meades, JE Moore Consulting, Inc.
Old Skills Center Demolition
Project Delivery Method:
Project Budget:
Construction Duration: Funding Source:

Design-Bid-Build
$5 million
2010 Proposition N

The Infrastructure Phase II project consists of utilities upgrades throughout the campus and along the 15th St. and 16th St. corridors. The design team is now in progress with the design of the new 16th St. sewer line replacement as well as the 15th St. sewer relocation. This project is funded by Proposition N.
  • Architect: Manuel Oncina Architect
  • Contractor: Anton's Services
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Thomas J. Fine, JE Moore Consulting, Inc.
  • Construction Manager: Guy Meades, JE Moore Consulting
Scope/Summary

The Infrastructure Phase II project consists of the utilities upgrades throughout the campus and along the 16th St. and 15th St. corridors. It is anticipated that numerous smaller projects will take place to support the construction of new and renovated buildings. The design team is now in progress with the design of the new 16th St. sewer line replacement as well as the 15th St. sewer relocation. This project is funded by Proposition N.

 14430 - Infrastructure Phase II: News & Events

4/12/2012V-Building Allows for a Quick Jolt - City Times
4/12/2012V-Building Allows for a Quick Jolt - City Times
8/23/2010'Executive Profile: Thomas J. Fine' - San Diego Business Journal
8/9/2010'Ground Breaking: San Diego City College Facility Master Plan/16th Street Precise Plan' - San Diego Business Journal
7/26/2010'Central Plant Upgrade at San Diego City College' - SD Business Journal
7/1/2010City College Propositions S & N Newsletter: July 2010 Edition
12/7/2009City College Facilities and Master Plan Update - Presentation by Dave Umstot
4/6/2009'San Diego City College transforms' SDDT.com Media